The work has been divided into five packages with individual tasks within the package.
Work Package One (WP1): Identify how sighted users interact with Web 2.0 sites and technologies
1.1 Sighted User Evaluation
1.2 Preliminary Visual Disability Interaction Investigation
1.3 Assistive Technology Review
Work Package Two (WP2): Identify the impact of Web 2.0 technology and sites on accessibility
technology within the context of compound documents and dynamic information streams
2.1 Web 2.0 Technologies (Domain)
2.2 Web 2.0 Sites (Range)
2.3 Compound Documents and Streams (Scope)
Work Package Three (WP3): Have developed a machine testable mapping along with any relevant additional non-testable components.
3.1 Mapping Framework Creation
3.2 Mapping Framework Model
Work Package Four (WP4): Have experimented over this mapping, and in the process of experimentation, built a single, structured accessibility stream for Web 2.0 Access Technologies
4.1 Capture Mappings Framework as Prototype
4.2 Experimentation and Mappings Framework Changes
4.3 Creation of Final Experimental Prototype
Work Package Five (WP5): Have evaluated this new accessibility stream with users, and have verified this evaluation with a double blind independent trial.
5.1 Evaluation Design
5.2 Iterative Evaluation of Experimental Prototype and Formulation of Key Performance Indicators
(KPI)
5.3 Final Evaluation of Experimental Prototype against KPI
5.4 Independent Re-Evaluation
There are several deliverables and milestones associated with the Work Packages. User Review Document (D1) and Assistive Devices Requirements (D2) with the milestone User Requirements Architecture (M1) are associated with Work Package One. Technical Review Document (D3) and Technical Requirements (D4) with the milestone Technical Requirements Architecture (M2) are associated with Work Package Two. Compound Document Mediation (D5) and Mappings Framework Model (D6) with the milestone Mappings Framework Model (M3) are associated with Work Package Three. SASWAT Findings (D7) and SASWAT Prototype (D8) with the milestone SASWAT Draft Report (M4) are
associated with Work Package Five.